Skip to content

Bump actions/checkout from 5 to 6 in the actions group #327

Bump actions/checkout from 5 to 6 in the actions group

Bump actions/checkout from 5 to 6 in the actions group #327

Triggered via pull request December 1, 2025 05:42
Status Failure
Total duration 1m 10s
Artifacts

tests.yaml

on: pull_request_target
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
pre-commit
Process completed with exit code 1.
tests (3.10)
Process completed with exit code 1.
tests (3.x)
The strategy configuration was canceled because "tests._3_10" failed
tests (3.x)
The operation was canceled.